Notes from the factory

How the work is actually done

Short pieces from the studio and the mills. Dye recipes, cloth weights and the reasons a reorder drifts — written for the person who has to sign off the run.

More from the studio

Pieces still being written show without a link rather than with a dead one.

Cloth swatches by weight, 240 to 500 gsm

The cloth

What 270 gsm actually feels like

Weight is the number every merch supplier quotes and the one nobody can convey on a screen. A short guide to reading gsm before the sample lands.

24 July 2026 · 5 min read

Two lots of the same hoodie, side by side

Production

Why the second run never matches

Colour drift, block drift and yarn lot drift are three different problems. Only one of them is the dye house.

9 June 2026 · 7 min read

Embroidery head running a left-chest mark

Finishing

Screen print or embroidery

A one-colour mark on 500 pieces and a four-colour mark on 25 are different jobs. How the setup cost decides which finish is right.

18 April 2026 · 4 min read

Making floor — Guimarães

The mills

A day on the making floor in Guimarães

Forty machinists, one block per blank, and the reason we cut our own patterns rather than buy someone else’s.

2 March 2026 · 8 min read

Reading is no substitute for handling the cloth

Samples are free if you return them within 60 days. MOQ is 25 pcs, production 14–21 days.

A designer’s desk in the Porto studio: fabric swatches, colour chips and rolled technical drawings
Design it in the browser, we make it in PortugalMOQ 25 pcs · sample in 7 days · production in 14–21 days